Inputs

Units
Template Type

SP Interval ()
Receiver Interval ()
Shot Line Space ()
Receive Line Space ()
Receive Lines Active
Receivers Active Per Line
Shots Fired In A Salvo
Roll (in crossline shots)

Survey Area (2)
Cost / Sq Km
Shots / Day

Results

Each Shot Fired
  times
Thousand Traces / Sq Km
Receivers / Sq Km
Unique Shots / Sq Km
Total Fold
Inline Bin Size
  
Crossline Bin Size
  
Minimum Offset
  
Minimum Continuous Offset
  
Maximum Offset
  
Maximum Continuous Offset
  
Shots Within Receiver Spread
Shots on Either Side of Spread
Maximum Continuous Crossline Offset
  
Maximum Continuous Inline Offset
  
Average Shot Density
OVT Analysis

OVT step size inline
  
OVT step size crossline
  
OVT's inline
OVT's crossline
Fully populated OVT's
OVT/Fold ratio


Operational Summary
Total shots in Survey
Total Receivers
Total Survey Cost
$
Cost / shot
$
Area shot / day
  2
Receiver Moves / day
Duration
  days
Shot to receiver roll ratio
  Download CSV (Inputs & Results)